System Layout and Piping
When designing system piping and layout
1. Use schedule 40 p. v .c. pipe and fittings throughout. Run 2″ feed to panels and 2″ on return at panels. On return from panels reduce to 1?” to equipment. When panels are below pool use
2. Keep panels as close to the pool equipment area as possible.
3. Always utilize space efficiently so that additional panels may be added at a later date.
4. Keep pipe runs vertically and horizontally to conform with panel array and roof lines. This gives the system. that professional look.
5. Make sure that distance between collectors or collectors and pipe or collectors and roof lInes are adequate for installation and servicing.
6. For freeze protection:
A) Install a vacuum breaker at the highest point or on feed pipe at collectors.
B) Install feed line below collector array.
C) For system that does not facilitate gravity drainage of panels (where solar plumbing crosses the ridge of the roof, or where panels are located below pool water level), provide a hose bib at the lowest point in collector array for manual draining.
The Gull Poly Pro’s extra large, Ultra-Flow 2™ manifolds and anti-clogging, straight flow-through tubes provide superior circulation and improved flow that stops the collector from clogging and creates less strain on filter pumps. Greater flow equals faster heating and cleaning of your swimming pool. Less strain means longer pump life and lower energy costs.
Panel Piping and Layout Diagrams
Coils are 6 ?' in diameter while Rectangular panels are 4'x10'
Single Bank Gull Sun Coils

Dual Bank Gull Sun Coils

Single Bank Gull Poly Pro

Dual Bank Gull Poly Pro